Skip to content

Project Status Report Presentation, Marketing Campaigns (PPTX)

$6.49

Price in USD. Local taxes calculated at checkout.

Buy 3 or more, save 20% from this shop

  • 1 ZIP download · PDF, PPTX, TTF, TXT, ZIP formats · 16:9; 13.333 × 7.5 in
  • Buyer protection. Corrupt or mismatched files? Full refund.

Item details

A ready-to-edit project status report presentation featuring spring campaign project, with a visual structure for project managers reporting progress.

The worked narrative uses stakeholders, campaign as its audience and offering. Original example wording illustrates how to structure your own content; numerical examples are editable teaching data.

Layouts in this edition address Project Health Dashboard; Progress by Workstream; Done and Doing; Schedule at a Glance; Spend vs. Plan; Risks and Issues; Options for Decision; Lessons So Far.

Visual content: 1 data chart, 1 editable table, 1 four-part analysis, 1 roadmap, 1 metric dashboard. Text, shapes and tables remain editable; chart graphics are editable geometric shapes with editable labels.

15 widescreen slides at 13.333 × 7.5 inches (16:9). The topband layout system uses blush rose colours, Lora headings and Atkinson Hyperlegible body text. Contrast and spacing distinguish headings from the body copy.

Everything arrives in one ZIP: the PPTX presentation, a 15-page PDF reference of the deck, the OFL typeface files with their licence, and README.txt with editing instructions. Install the included fonts to reproduce the displayed layout. The cover and detail show real exported slides from this edition.

Open the editable presentation, replace the example content with your own material, and save a copy. This digital product contains no macros or remote links.

File specs

FormatsPDF, PPTX, TTF, TXT, ZIP
Dimensions16:9; 13.333 × 7.5 in
Color spacesRGB
Downloadable files1 ZIP download · PDF, PPTX, TTF, TXT, ZIP formats
CategoryTemplates
Last updated

What you’ll download

  • zipProject-Status-Report-Presentation-Marketing-Campaigns.zip1.3 MB

Usage

Educo states how these files may be used in the listing description. Check it before you buy, and message the shop if you’re unsure.

Reselling, sharing or redistributing the original files as they are isn’t allowed, including in free packs or AI training sets.

Related searches

Reviews for this item

No reviews yet.

Questions about this file

No questions yet.

Quick answers

What files are included with Project Status Report Presentation, Marketing Campaigns (PPTX)?

1 ZIP download · PDF, PPTX, TTF, TXT, ZIP formats; 16:9; 13.333 × 7.5 in. See Item details and What you’ll download for the contents of each package.

How can I use these files?

The shop states how its files may be used in the listing description, so check it before buying and message the shop if you’re unsure. Reselling or redistributing the original files as they are isn’t allowed.

Which apps and devices does it work with?

The supplied formats are PDF, PPTX, TTF, TXT, ZIP. Check that your app and device support these files and the features you need before buying.

How do I get my files after buying?

After payment, download your files right away. Your receipt email links to them, and with an Esano account they also stay in Purchases. If a download is a ZIP, unzip it to access the files inside. No physical item is shipped.

Meet the shop

Educo

To draw out potentical · On Esano since 2026

More from Educo

Visit shop

You may also like