Skip to content

Project Planner Planner Pages PDF - Moss Boho

$6.49

Price in USD. Local taxes calculated at checkout.

Buy 3 or more, save 20% from this shop

  • 1 ZIP download · PDF, ZIP formats · US Letter + A4
  • Buyer protection. Corrupt or mismatched files? Full refund.

Item details

Stay on top of work and home with these project planner pages in a boho moss design. Print what you need, when you need it.

What's inside: - 1 cover page - 6 one-page project planners with goal, deadline, milestones, tasks, resources, and risks - 1 task tracker table and 1 eight-week timeline grid

Slip them into a binder, clipboard, or planner, or print a few copies and keep them handy.

One ZIP download (Project-Planner.zip) holds 2 PDF files: Project-Planner-US-Letter.pdf; Project-Planner-A4.pdf. Print versions come in US Letter (8.5 x 11 in), A4 (8.27 x 11.69 in), portrait orientation, 9 pages each.

All pages are built from vector shapes and embedded fonts, so nothing looks blurry when printed. Use "actual size" in the print dialog; the page margins leave room for a standard 3-hole punch. This is a digital download; no physical item is shipped.

Works with Any PDF reader.

File specs

FormatsPDF, ZIP
DimensionsUS Letter + A4
Color spacesRGB
Downloadable files1 ZIP download · PDF, ZIP formats
CategoryPlanners & Printables
Last updated

What you’ll download

  • zipProject-Planner.zip84 KB

Usage

Educo states how these files may be used in the listing description. Check it before you buy, and message the shop if you’re unsure.

Reselling, sharing or redistributing the original files as they are isn’t allowed, including in free packs or AI training sets.

Related searches

Reviews for this item

No reviews yet.

Questions about this file

No questions yet.

Quick answers

What files are included with Project Planner Planner Pages PDF - Moss Boho?

1 ZIP download · PDF, ZIP formats; US Letter + A4. See Item details and What you’ll download for the contents of each package.

How can I use these files?

The shop states how its files may be used in the listing description, so check it before buying and message the shop if you’re unsure. Reselling or redistributing the original files as they are isn’t allowed.

Which apps and devices does it work with?

The seller lists Any PDF reader. The supplied formats are PDF, ZIP. Check that your app and device support these files and the features you need before buying.

How do I get my files after buying?

After payment, download your files right away. Your receipt email links to them, and with an Esano account they also stay in Purchases. If a download is a ZIP, unzip it to access the files inside. No physical item is shipped.

Meet the shop

Educo

To draw out potentical · On Esano since 2026

More from Educo

Visit shop

You may also like